Greystar, White Point buys land for future high rise in Charlotte’s South End

0
1271

Greystar, in partnership with White Point, has recently closed on 1714 South Boulevard in Charlotte’s South End neighborhood.

The parcel of land is the future site of a 24-story building with 324 apartment units and approximately 15,000 sq. ft. of ground floor retail.

The high-rise community will feature a variety of floorplans from microunits to three-bedrooms. The units will have high-end finishes including custom closets, elevated appliance and fixture packages, and custom details throughout the units. Additionally, the building will feature more than 20,000 sq. ft. of amenity space so that residents can work, relax, exercise or enjoy the Charlotte skyline from the rooftop.

The building will feature EV charging and has a high walkability score with access to public transit. Greystar is focused on minimizing onsite waste and maximizing indoor environmental quality through use of smart thermostats, lighting control strategies and safer materials.

The neighborhood’s past as a warehouse district will be at the forefront of the designer’s vision with a masonry exterior and oversized windows that are a nod to the past while still offering a unique take on South End’s future.

The planned high rise is adjacent to Dilworth Artisan Station, an adaptive re-use project by White Point. Greystar and White Point have worked closely on the development of the residential project and are working to ensure the residential project and Dilworth Artisan Station are integrated closely to create a truly unique place at the heart of South End.

Greystar is working on a number of other projects in Charlotte, including a project in Lower South End, a large two-phase project in University City, and a project in Indian Trail.

White Point has over $800 million of mixed-use projects in planning or under development in Charlotte, Charleston, and Raleigh/Research Triangle Park.

Construction on the building is scheduled to start in December 2021 with an opening date target of January 2024.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.